I think this slab was laid post war, certainly 40+ years ago

its in good condition but I had thought my only option is to bang back into it to get fixings. Am planning on drilling thru and resin fixing threaded rods, then bolt down sole plate on top of DPC. Being as neat as poss around the rods with the DPC.

Should I just go for it then, Den?

Posted By: MIKEWALKER on September 15th 2016 at 14:28:49


Message Thread


Reply to Message

In order to add a post to the WotB Message Board you must be a registered WotB user.

If you are not yet registered then please visit the registration page. You should ensure that their browser is setup to accept cookies.

Log in