how long to amortize the outlay? windows/boiler?

we've had the loft done and thinking of replacing the windys with triple glazing and might do the boiler but with a ground sauce heat parper.

Posted By: Tombs, Jan 25, 10:58:44

Follow Ups

Reply to Message

Log in


Written & Designed By Ben Graves 1999-2025