the one that has had traffic lights installed on in Dec 18 and at one end of the last part of the A11 that was dualled leading into Thetford
sat in a 4 mile queue last Friday and looking at Google maps it seems that its a regular occurrence for it to be virtually grid locked in several directions
after the A11 from the roundabout to thetford was dualled it took 10-15 mins of the trip to London it seems they have added 30 mins to the trip
the single carriage way was reckoned to be a barrier to some companies coming to Norfolk , now they have put the barrier back in place
User Posted Link
Posted By: ghostof barry butler, Jun 24, 17:30:43
Written & Designed By Ben Graves 1999-2025