Wait 3 to 6 months, and watch them go flooding back to Microsoft.
3 x 3.2Ghz cores AND the next-gen ATI graphics card?
Firstly, it's going to need shedloads of power, and secondly, it's going to generate absolute s**tloads of heat. Burnout city.
Posted By: Iwan Husarmi, May 13, 19:46:21
Written & Designed By Ben Graves 1999-2025